It's been awhile since I've updated you on the construction, almost a month, and I'm delighted to say that things are moving along very well. These pictures are from last weekend and show that the roofing is finished and the siding and porches are almost done. The HVAC guys have installed three of the four furnaces and I've done a walk through with the electrician to locate receptacles, fixtures, etc. We've actually installed a couple of circuits and hopefully the electric company will energize the panels so that the guys don't have to keep dealing with extension cords run from the carriage house.
The other day I met with the guys who will be dong the garage doors, the central vac and the insulation. We plan to have all of the sheet rock up by early July so there's going to be a whole bunch of activity between now and then.
Since the exterior is pretty much done I was able to clean up the grounds and grade the site which had really been trashed out over the winter. It great to have a tractors and the right.
landscaping tools.
Thanks larger to the efforts of my construction manager we haven't run into any big problems and so far things are within budget.
That's it for now, I'll have more up to date photos next weekend.